top of page

Kingspan
Wind Energy Scheme
Construction
Finalise designs
In parallel with the planning process, construction and electrical engineers will visit the site to identify what issues there will be in building and installing the turbine. We are very experienced in dealing with the complexity of connecting into on-site electrical infrastructure.
Construct and energise
This stage involves the physical construction of the turbine foundation, managing the erection of the turbine, and connecting it into the site’s electrical system. Through close liaison, we minimise disruption to the local community and ensure that the health and safety of all remains paramount.

Transformer delivery at Eastman

Blade lift at Eastman
bottom of page